Subject: [SLR-Mail] No. 1092: MLRO down From: Giuseppe Bianco, ASI/CGS, Matera, Italy > ******************************************************************************** SLR Electronic Mail 2003-06-04 16:12:00 UTC Message No. 1092 ******************************************************************************** Author: Giuseppe Bianco, ASI/CGS, Matera, Italy Subject: MLRO down Dear colleagues unfortunately the MLRO system is currently down due to a laser = malfunction. The diode laser must be shipped back in USA for inspection = and repair.=20 We foresee a down time period of several weeks.=20 Best regards Dr. Giuseppe Bianco Centro di Geodesia Spaziale ”G. Colombo” Agenzia Spaziale Italiana 75100 Matera (MT), Italy phone:+39-0835-377209 fax: +39-0835-339005 e-mail: giuseppe.bianco@asi.it ------_=_NextPart_001_01C32A7E.74752790 Content-Type: text/html; charset=”iso-8859-1” Content-Transfer-Encoding: quoted-printable MLRO down

Author: Giuseppe Bianco, ASI/CGS, = Matera, Italy

Dear colleagues
unfortunately the MLRO system is = currently down due to a laser malfunction. The diode laser must be = shipped back in USA for inspection and repair.

We foresee a down time period of = several weeks.
Best regards

Dr. Giuseppe Bianco
Centro di Geodesia Spaziale "G. = Colombo"
Agenzia Spaziale Italiana
75100 Matera (MT), Italy
phone:+39-0835-377209
fax:     = +39-0835-339005
e-mail: giuseppe.bianco@asi.it

------_=_NextPart_001_01C32A7E.74752790-- From: ”Bianco Giuseppe” ********************************************************************************