Subject: [SLR-Mail] No. 1127: MLRO Operational From: Giuseppe Bianco, ASI/CGS, Matera, Italy > ******************************************************************************** SLR Electronic Mail 2003-09-12 13:59:00 UTC Message No. 1127 ******************************************************************************** Author: Giuseppe Bianco, ASI/CGS, Matera, Italy Subject: MLRO Operational The MLRO system is operational. The diode laser had to be shipped in the = USA for repair and custom procedure took much more time than expected. Bets regards Pippo Bianco Dr. Giuseppe Bianco Centro di Geodesia Spaziale ”G. Colombo” Agenzia Spaziale Italiana 75100 Matera (MT), Italy phone:+39-0835-377209 fax: +39-0835-339005 e-mail: giuseppe.bianco@asi.it ------_=_NextPart_001_01C37919.0421616F Content-Type: text/html; charset=”iso-8859-1” Content-Transfer-Encoding: quoted-printable MLRO Operational

Author: Giuseppe Bianco, ASI/CGS, = Matera, Italy

The MLRO system is operational. The = diode laser had to be shipped in the USA for repair and custom procedure = took much more time than expected.

Bets regards

Pippo Bianco

Dr. Giuseppe Bianco
Centro di Geodesia Spaziale "G. = Colombo"
Agenzia Spaziale Italiana
75100 Matera (MT), Italy
phone:+39-0835-377209
fax:     = +39-0835-339005
e-mail: giuseppe.bianco@asi.it

------_=_NextPart_001_01C37919.0421616F-- From: ”Bianco Giuseppe” ********************************************************************************