Welcome >  Mailing Lists >  SLR-Mail No.1091

SLR-Mail No.1091

Back to Overview

Date:2003-05-23 18:01:00
Sender:Scott Wetzel <slrmail@dgfi.badw.de>
Subject:[SLR-Mail] No. 1091: Status of Moblas 4 at Monument Peak
Author:Scott Wetzel
Content:********************************************************************************
SLR Electronic Mail 2003-05-23 18:01:00 UTC Message No. 1091
********************************************************************************


Author: Scott Wetzel
Subject: Status of Moblas 4 at Monument Peak

Dear Colleagues,

I am pleased to notify you that the repairs to Moblas 4, Monument Peak, are nearing completion. Currently, Moblas 4 is in a testing mode to verify the replacement of their azimuth drive motor. Several passes have been tracked and have been released.

Please be aware that since the mount was removed from the site for repair and subsequently returned, the position has changed. A survey of the system is scheduled to be performed sometime shortly after June 9th. An updated survey will be provided by
normal methods. Until then, we anticipate a small offset from Moblas 4´s past position. We apologize for any inconvenience this may cause the analysis community.

Many thanks to the many people who made this repair possible in such as relatively short time.

Very best regards.

Scott

NASA SLR/VLBI Deputy Program Manager
Honeywell Technology Solutions Inc.

”/DGFI3/home/slrmail/mbox” complete
From: slrmail@dgfi.badw.de

********************************************************************************

Find more topics on the central web site of the Technical University of Munich: www.tum.de