Date: | 2003-06-04 16:12:00 | |
Sender: | Giuseppe Bianco, ASI/CGS, Matera, Italy <Bianco Giuseppe <giuseppe.bianco@asi.it>> | |
Subject: | [SLR-Mail] No. 1092: MLRO down | |
Author: | Giuseppe Bianco, ASI | |
Content: | ******************************************************************************** SLR Electronic Mail 2003-06-04 16:12:00 UTC Message No. 1092 ******************************************************************************** Author: Giuseppe Bianco, ASI/CGS, Matera, Italy Subject: MLRO down Dear colleagues unfortunately the MLRO system is currently down due to a laser = malfunction. The diode laser must be shipped back in USA for inspection = and repair.=20 We foresee a down time period of several weeks.=20 Best regards Dr. Giuseppe Bianco Centro di Geodesia Spaziale ”G. Colombo” Agenzia Spaziale Italiana 75100 Matera (MT), Italy phone:+39-0835-377209 fax: +39-0835-339005 e-mail: giuseppe.bianco@asi.it ------_=_NextPart_001_01C32A7E.74752790 Content-Type: text/html; charset=”iso-8859-1” Content-Transfer-Encoding: quoted-printable charset=3Diso-8859-1”> 6.0.5762.3”> Author: Giuseppe Bianco, ASI/CGS, = Dear colleagues We foresee a down time period of = Dr. Giuseppe Bianco ------_=_NextPart_001_01C32A7E.74752790-- From: ”Bianco Giuseppe” ******************************************************************************** |