Date: | 2003-09-12 13:59:00 | |
Sender: | Giuseppe Bianco, ASI/CGS, Matera, Italy <Bianco Giuseppe <giuseppe.bianco@asi.it>> | |
Subject: | [SLR-Mail] No. 1127: MLRO Operational | |
Author: | Giuseppe Bianco, ASI | |
Content: | ******************************************************************************** SLR Electronic Mail 2003-09-12 13:59:00 UTC Message No. 1127 ******************************************************************************** Author: Giuseppe Bianco, ASI/CGS, Matera, Italy Subject: MLRO Operational The MLRO system is operational. The diode laser had to be shipped in the = USA for repair and custom procedure took much more time than expected. Bets regards Pippo Bianco Dr. Giuseppe Bianco Centro di Geodesia Spaziale ”G. Colombo” Agenzia Spaziale Italiana 75100 Matera (MT), Italy phone:+39-0835-377209 fax: +39-0835-339005 e-mail: giuseppe.bianco@asi.it ------_=_NextPart_001_01C37919.0421616F Content-Type: text/html; charset=”iso-8859-1” Content-Transfer-Encoding: quoted-printable charset=3Diso-8859-1”> 6.0.5762.3”> Author: Giuseppe Bianco, ASI/CGS, = The MLRO system is operational. The = Bets regards Pippo Bianco Dr. Giuseppe Bianco ------_=_NextPart_001_01C37919.0421616F-- From: ”Bianco Giuseppe” ******************************************************************************** |