| Date: | 2003-09-12 13:59:00 | |
| Sender: | Giuseppe Bianco, ASI/CGS, Matera, Italy <Bianco Giuseppe> | |
| Subject: | [SLR-Mail] No. 1127: MLRO Operational | |
| Author: | ||
| Content: | ******************************************************************************** SLR Electronic Mail 2003-09-12 13:59:00 UTC Message No. 1127 ******************************************************************************** Author: Giuseppe Bianco, ASI/CGS, Matera, Italy Subject: MLRO Operational The MLRO system is operational. The diode laser had to be shipped in the = USA for repair and custom procedure took much more time than expected. Bets regards Pippo Bianco Dr. Giuseppe Bianco Centro di Geodesia Spaziale `G. Colombo` Agenzia Spaziale Italiana 75100 Matera (MT), Italy phone:+39-0835-377209 fax: +39-0835-339005 e-mail: giuseppe.bianco@asi.it ------_=_NextPart_001_01C37919.0421616F Content-Type: text/html; charset=`iso-8859-1` Content-Transfer-Encoding: quoted-printable charset=3Diso-8859-1`> 6.0.5762.3`> Author: Giuseppe Bianco, ASI/CGS, = The MLRO system is operational. The = Bets regards Pippo Bianco Dr. Giuseppe Bianco ------_=_NextPart_001_01C37919.0421616F-- From: `Bianco Giuseppe` ******************************************************************************** |