Date: | 2005-02-07 12:36:00 | |
Sender: | Johan Bernhardt <slrmail@dgfi.badw.de> | |
Subject: | [SLR-Mail] No. 1301: 7501 HARL: Operational Status | |
Author: | Johan Bernhardt | |
Content: | ******************************************************************************** SLR Electronic Mail 2005-02-07 12:36:00 UTC Message No. 1301 ******************************************************************************** Author: Johan Bernhardt Subject: 7501 HARL: Operational Status Hi All, MOBLAS 6 laser system failed this morning at 02h00 due to a water leak at the laser amplifier assembly, after replacing a faulty hose and drying out the optics we did minor alignment to the oscillator and doubler and resume operational status at 06h00. We regret the loss of data during this period. Regards, Johan. From: slrmail@dgfi.badw.de ******************************************************************************** |