Date: | 2006-10-16 09:19:00 | |
Sender: | David Carter, NASA SLR Networks Manager <Horvath, Julie E. <Julie.Horvath@honeywell-tsi.com>> | |
Subject: | [SLR-Mail] No. 1500: 7403: Arequipa, Peru: TLRS-3 SLR Data to be released | |
Author: | David Carter, NASA SLR Networks Manager | |
Content: | ******************************************************************************** SLR Electronic Mail 2006-10-16 09:19:00 UTC Message No. 1500 ******************************************************************************** Author: David Carter, NASA SLR Networks Manager Subject: 7403: Arequipa, Peru: TLRS-3 SLR Data to be released =20 =20 Dear Colleagues, =20 NASA is pleased to announce that the TLRS-3 system, located at Arequipa, Peru, has once again begun operating after more than 2 years of hiatus. The TLRS-3 crew, as well as HTSI engineers, have obtained over 80 SLR passes since the end of September. Although the system is still in an engineering check-out period, we will be releasing this preliminary data in the next few days for your evaluation. Please be aware that TLRS-3 has not yet been surveyed since the system was reinitialized. A survey will be performed in the near future, and the system site log will then be updated on the ILRS web site. =20 We would like to welcome any and all analysis of this critically located SLR data. =20 Thank you, =20 David L. Carter NASA/GSFC SLR Networks Manager David.L.Carter@nasa.gov 301-614-5966 =20 ------_=_NextPart_001_01C6F0DB.BF9BBC8C Content-Type: text/html; charset=”us-ascii” Content-Transfer-Encoding: quoted-printable charset=3Dus-ascii”> class=3D835450902-16102006>Author: David=20 Carter, NASA SLR Networks=20 Manager class=3D835450902-16102006> class=3D835450902-16102006> Dear=20 Colleagues, class=3D835450902-16102006> NASA = is pleased=20 to announce that the TLRS-3 system, located at Arequipa, Peru, has once = again=20 begun operating after more than 2 years of hiatus. The TLRS-3 = crewclass=3D143273603-16102006>, as well as HTSI engineersclass=3D143273603-16102006>, have obtained over class=3D143273603-16102006>80 SLR passes since the end of = September. =20 Although the system is still in an engineering check-out period, = we class=3D543373403-16102006>will be releasing this = preliminary=20 data in the next few = days for=20 your evaluation. Please be aware that class=3D143273603-16102006>TLRS-3 has not yet been surveyed since = the=20 system was = reinitialized. A=20 survey will be performed in the near future, and the system site log = will then=20 be updated on the ILRS web site. class=3D835450902-16102006> We = would like to=20 welcome any and all analysis of this critically located SLR=20 data. class=3D835450902-16102006> Thank=20 you, class=3D835450902-16102006> class=3D835450902-16102006>Davidclass=3D143273603-16102006> L. Carter class=3D143273603-16102006>NASA/GSFC class=3D143273603-16102006>SLR Networks = Manager class=3D143273603-16102006>href=3D”mailto:David.L.Carter@nasa.gov”>David.L.Carter@nasa.gov> class=3D143273603-16102006>301-614-5966 ------_=_NextPart_001_01C6F0DB.BF9BBC8C-- From: ”Horvath, Julie E.” ******************************************************************************** |