SLR Electronic Mail 2006-10-16 09:19:00 UTC Message No. 1500
********************************************************************************


Author: David Carter, NASA SLR Networks Manager
Subject: 7403: Arequipa, Peru: TLRS-3 SLR Data to be released
=20
=20
Dear Colleagues,
=20
NASA is pleased to announce that the TLRS-3 system, located at Arequipa,
Peru, has once again begun operating after more than 2 years of hiatus.
The TLRS-3 crew, as well as HTSI engineers, have obtained over 80 SLR
passes since the end of September. Although the system is still in an
engineering check-out period, we will be releasing this preliminary data
in the next few days for your evaluation. Please be aware that TLRS-3
has not yet been surveyed since the system was reinitialized. A survey
will be performed in the near future, and the system site log will then
be updated on the ILRS web site.
=20
We would like to welcome any and all analysis of this critically located
SLR data.
=20
Thank you,
=20
David L. Carter
NASA/GSFC
SLR Networks Manager
David.L.Carter@nasa.gov
301-614-5966
=20

------_=_NextPart_001_01C6F0DB.BF9BBC8C
Content-Type: text/html;
charset=”us-ascii”
Content-Transfer-Encoding: quoted-printable



charset=3Dus-ascii”>



class=3D835450902-16102006>Author:  David=20
Carter, NASA SLR Networks=20
Manager

class=3D835450902-16102006> 

class=3D835450902-16102006> 

Dear=20
Colleagues,

class=3D835450902-16102006> 

NASA =
is pleased=20
to announce that the TLRS-3 system, located at Arequipa, Peru, has once =
again=20
begun operating after more than 2 years of hiatus.  The TLRS-3 =
crewclass=3D143273603-16102006>,
as well as HTSI engineersclass=3D143273603-16102006>, have obtained over class=3D143273603-16102006>80 SLR passes since the end of =
September. =20
Although the system is still in an engineering check-out period, =
we class=3D543373403-16102006>will be releasing this =
preliminary=20
data in the next few =
days 
for=20
your evaluation.  Please be aware that class=3D143273603-16102006>TLRS-3 has not yet been surveyed since =
the=20
system was =
reinitialized.  A=20
survey will be performed in the near future, and the system site log =
will then=20
be updated on the ILRS web site.

class=3D835450902-16102006> 

We =
would like to=20
welcome any and all analysis of this critically located SLR=20
data.

class=3D835450902-16102006> 

Thank=20
you,

class=3D835450902-16102006> 

class=3D835450902-16102006>Davidclass=3D143273603-16102006> L. Carter

class=3D143273603-16102006>NASA/GSFC

class=3D143273603-16102006>SLR Networks =
Manager

class=3D143273603-16102006>href=3D”mailto:David.L.Carter@nasa.gov”>David.L.Carter@nasa.gov>

class=3D143273603-16102006>301-614-5966

 


------_=_NextPart_001_01C6F0DB.BF9BBC8C--

From: ”Horvath, Julie E.”

********************************************************************************

Find more topics on the central web site of the Technical University of Munich: www.tum.de