Welcome >  Mailing Lists >  SLR-Mail No.208

SLR-Mail No.208

Back to Overview

Date:1998-12-22 18:00:00
Sender:Mike Pearlman <[Mailed Mike Pearlman <mpearlman@cfa.harvard.edu>]>
Subject:[SLR-Mail] No. 208: SLR Support for TOPEX during DORIS Outage and Calibration
Author:Mike Pearlman
Content:********************************************************************************
SLR Electronic Mail 1998-12-22 18:00:00 UTC Message No. 208
********************************************************************************


Author: Mike Pearlman
Subject: SLR Support for TOPEX during DORIS Outage and Calibration

Secretary, ILRS Central Bureau


The DORIS receiver on board TOPEX failed a few days ago. We
understand from Mark Fujishin the TOPEX/Poseidon Mission Manager
that the B-side has been powered up and looks fine so far. The
restart sequence and the beacon uploads are now underway. Several
days will be required for warm up and stabilization, and then the
on-board delay of DORIS B must be calibrated using the SLR orbits.
This sequence will take three 10 day cycles or about 30 days.

The SLR network support on TOPEX continues to be substantial, but we
are moving into a period that is traditionally marked by poor
weather. In order to maintain quality orbits through this difficult
period, the TOPEX project has requested that we maintain as much as
possible our normal tracking operations and priorities during the
holiday season. Every pass will count.

Good luck and best wishes for the holiday season.




Dr. Michael R. Pearlman
Harvard-Smithsonian
Center for Astrophysics
60 Garden St.
Cambridge MA 02138
tel. (617) 495-7481
fax. (617) 495-7105
e-mail. mpearlman@cfa.harvard.edu

[Mailed From: ”Mike Pearlman” ]

********************************************************************************

Find more topics on the central web site of the Technical University of Munich: www.tum.de