Welcome >  Mailing Lists >  SLR-Mail No.2806

SLR-Mail No.2806

Back to Overview

Date:2023-09-05 16:22:57
Sender:Andrea Di Mira <Andrea.Di.Mira@esa.int>
Subject:[SLR-Mail] No.2806: 7701 IZ1L - Temporary interruption of SLR operations due to wildfires on Tenerife
Author:unknown
Content:Dear Team,

I would like to inform you that starting from August 17th, we have been unable to operate IZN-1 station due to the wildfires that have occurred on Tenerife.
Luckily, the station itself has not been damaged, but the presence of ashes and smoke in the area has made it impossible to conduct station operations.
Currently the situation is improving but, as a result of the wildfires, a prolonged power outage lasting for two days has affected the remote accessibility of some optical components in one of the station subsystems.
We are currently looking for a solution to resume SLR.

Thank you for your understanding

Best regards,
Andrea





ESA - European Space Agency

Andrea Di Mira
Optical System Engineer
Optical Technologies Section (OPS-GSO)

ESOC - European Space Operation Centre
Robert-Bosch-Str. 5, D-64293 Darmstadt, Germany
andrea.di.mira@esa.int | www.esa.int
T +49 6151 902364


This message is intended only for the recipient(s) named above. It may contain proprietary information and/or protected content. Any unauthorised disclosure, use, retention or dissemination is prohibited. If you have received this e-mail in error, please notify the sender immediately. ESA applies appropriate organisational measures to protect personal data, in case of data privacy queries, please contact the ESA Data Protection Officer (dpo@esa.int).







Dear Team,


 


I would like to inform you that starting from August 17th, we have been unable to operate IZN-1 station due to the wildfires that have occurred on Tenerife.


Luckily, the station itself has not been damaged, but the presence of ashes and smoke in the area has made it impossible to conduct station operations.


Currently the situation is improving but, as a result of the wildfires, a prolonged power outage lasting for two days has affected the remote accessibility of some optical components in one of the station subsystems.


We are currently looking for a solution to resume SLR.


 


Thank you for your understanding


 


Best regards,


Andrea


 


 


 


 


 


ESA – European Space Agency


 


Andrea Di Mira


Optical System Engineer


Optical Technologies Section (OPS-GSO)



ESOC - European Space Operation Centre

Robert-Bosch-Str. 5, D-64293 Darmstadt, Germany

andrea.di.mira@esa.int |
www.esa.int  


T +49 6151 902364


 


 



This message is intended only for the recipient(s) named above. It may contain proprietary information and/or protected content. Any unauthorised disclosure, use, retention or dissemination is prohibited. If you have received this e-mail in error, please notify
the sender immediately. ESA applies appropriate organisational measures to protect personal data, in case of data privacy queries, please contact the ESA Data Protection Officer (dpo@esa.int).

Find more topics on the central web site of the Technical University of Munich: www.tum.de