Welcome >  Mailing Lists >  SLR-Report No.5020

SLR-Report No.5020

Back to Overview

Date:2005-03-04 10:15:00
Sender:MCC, cnss@mcc.rsa.ru <slreport@dgfi.badw.de>
Subject:[SLR-Report] No. 5020: Residual Analysis Report (050303.r)
Author:MCC, cnss
Content:********************************************************************************
SLR Electronic Report 2005-03-04 10:15:00 UTC Message No. 5020
********************************************************************************

Author: MCC, cnss@mcc.rsa.ru
Subject: Residual Analysis Report (050303.r)

Russian Mission Control Center
Residual Analysis Report

Residuals are summarized for the following 3-day arcs: wtd rms(cm)
LAG-1 LAG-2 5-DAY ARC 05/02/12 12.00 - 05/02/17 12.00 1.8
LAG-1 LAG-2 3-DAY ARC 05/02/14 12.00 - 05/02/17 12.00 1.9
LAG-1 LAG-2 3-DAY ARC 05/02/15 12.00 - 05/02/18 12.00 2.2
LAG-1 LAG-2 3-DAY ARC 05/02/16 12.00 - 05/02/19 12.00 1.6
LAG-1 LAG-2 3-DAY ARC 05/02/17 12.00 - 05/02/20 12.00 1.5
LAG-1 LAG-2 3-DAY ARC 05/02/18 12.00 - 05/02/21 12.00 1.6
LAG-1 LAG-2 3-DAY ARC 05/02/19 12.00 - 05/02/22 12.00 1.7
LAG-1 LAG-2 3-DAY ARC 05/02/20 12.00 - 05/02/23 12.00 1.9
LAG-1 LAG-2 3-DAY ARC 05/02/21 12.00 - 05/02/24 12.00 1.7
LAG-1 LAG-2 3-DAY ARC 05/02/22 12.00 - 05/02/25 12.00 1.6
LAG-1 LAG-2 3-DAY ARC 05/02/23 12.00 - 05/02/26 12.00 1.3
________________________________________________________________________________________________________________________
Komsomolsk ( 1868 NP ) Modeled Bias = -49 mm

DATA T ini T fin SC TTL INC ME RMS ORMS ELEV T P H CALIB TB RB PRMS SCI
mm mm mm deg C mbar % mm us mm mm
1868 18.02.05 15:51 16:09 L2 10 09 26 8 29 034-050 -25 998.9 73 35548 10 18 4 0
__________________________________________________________________________________________________________________

Komsomolsk ( 1868 RAW ) Modeled Bias = -49 mm

DATA T ini T fin SC TTL INC ME RMS ORMS ELEV T P H CALIB TB RB PRMS SCI
mm mm mm deg C mm % mm us mm mm
1868 18.02.05 15:51 16:09 L2 0906 0844 29 6 29 034-050 -25 749.2 73 35548 8 20 4 0
__________________________________________________________________________________________________________________

====================================================================================================
Adopted abbreviations

Date - Day, Month, Year
Tini,Tfin - Time Interval of Passes (hh:mm)
SC - Spacecraft Name
TTL - Total Measurements Number in the Pass
INC - Included Measurements Number in the Pass
ME - Mathematical Expectation
RMS - Root Mean Square for ME
ORMS - Root MEAN Square for the Orbit
ELEV - Elevation Angles (min-max)
T - Temperature, Celsium degrees
P - Atmospheric Pressure, mbar
H - Humidity, %
CALIB - Calibration Delay Shift, mm
TB - Time Bias, microsecond (if TB = ” * ”, then no estimate for TB)
RB - Range Bias, mm (if RB = ” * ”, then no estimate for RB)
PRMS - Precise RMS for Approx, Polynomial, mm
SCI - System Configuration Indicator
___________________________________________________________________________________________________


From: slreport@dgfi.badw.de

********************************************************************************

Find more topics on the central web site of the Technical University of Munich: www.tum.de