SOD | Year | Day of Year |
Time of Day |
Data Impact | System | Description |
---|---|---|---|---|---|---|
78197821 | 2024 | 066 | 11:50 | 1 | 6.01.01 | We replaced the gate cable from control system and the signal cable to TC454 device on Mar. 5, 2024. |
78197821 | 2022 | 346 | 11:00 | 1 | 5.01 | The laser was replaced by a new one with 532nm wavelength, more than 2mJ/pulse energy, 2000Hz max frequency and less than 50ps pulse width main parameters. |
78197821 | 2022 | 304 | 15:00 | 1 | 6.01.01 | The trigger voltage of TC454 device is adjusted from -0.366 voltage to -2.93 voltage. |
78197821 | 2022 | 088 | 10:00 | 1 | 6.01.01 | The receive optical path was modified between the C-SPAD and the receive telescope. |
Latest Data
Tracking Statistics
Logs